Plans in for £150m Leeds private rental flats scheme
Plans in for £150m Leeds private rental flats scheme
Developer Glenbrook aims to appoint a contractor this summer
- News |
- Aire |
- Build-to-rent |
- building |
- construction |
- Glenbrook |
- Kirkstall-Road |
- Leeds
You can contact us to get more choices
0
You can contact us to get more choices
Related posts
Developer Glenbrook aims to appoint a contractor this summer
Developer Glenbrook aims to appoint a contractor this summer
The Yorkshire developer aims to build nearly 2,000 homes, alongside 650,000 sq ft of offices, retail, leisure and community uses, as well as a new linear park along Sweet Street. The brownfield site, which is located just off Meadow Road to the South of the city centre and is currently used as a temporary car park, will be called City One Leeds. The development will comprise of around 10 feature buildings, interwoven with new amenities and extensive green open spaces and landscaping accounting...
The Yorkshire developer aims to build nearly 2,000 homes, alongside 650,000 sq ft of offices, retail, leisure and community uses, as well as a new linear park along Sweet Street. The brownfield site, which is located just off Meadow Road to the South of the city centre and is currently used as a temporary car park, will be called City One Leeds. The development will comprise of around 10 feature buildings, interwoven with new amenities and extensive green open spaces and landscaping accounting...
Platform_ said its Sweet Street scheme of 1,350 flats would represent a £500m investment for the local region. The ambitious masterplan also includes two office offices buildings of 20,000 sq m, new leisure and retail opportunities, and the regeneration of a historic pub. Jean-Marc Vandevivere, CEO of Platform_, said: “We see fantastic opportunities in Leeds, one of the fastest-growing cities in the UK, and the South Bank area in particular. We are proud to present a transformational vision...
Platform_ said its Sweet Street scheme of 1,350 flats would represent a £500m investment for the local region. The ambitious masterplan also includes two office offices buildings of 20,000 sq m, new leisure and retail opportunities, and the regeneration of a historic pub. Jean-Marc Vandevivere, CEO of Platform_, said: “We see fantastic opportunities in Leeds, one of the fastest-growing cities in the UK, and the South Bank area in particular. We are proud to present a transformational vision...
Duo of build to rent blocks form part of wider £280m Whitehall Riverside masterplan
Duo of build to rent blocks form part of wider £280m Whitehall Riverside masterplan
The £95m construction project will be delivered at a four-acre site on Camp Hill near Digbeth where hit TV series Peaky Blinders was filmed. The Digbeth scheme approved by Birmingham City Council is the developer’s first build-to-rent residential development. Designed by Darling Associate Architects, the phased project will consist of a landmark 26-storey block with associated mid-rises of around 9-storeys and a dozen three storey town houses. Goodstone Living is focused on reducing embodie...
The £95m construction project will be delivered at a four-acre site on Camp Hill near Digbeth where hit TV series Peaky Blinders was filmed. The Digbeth scheme approved by Birmingham City Council is the developer’s first build-to-rent residential development. Designed by Darling Associate Architects, the phased project will consist of a landmark 26-storey block with associated mid-rises of around 9-storeys and a dozen three storey town houses. Goodstone Living is focused on reducing embodie...
£200m scheme to kick off multiple plans to develop city fringe site next to River Aire
£200m scheme to kick off multiple plans to develop city fringe site next to River Aire
Revised plans to be submitted by the end of the year for start soon after
Revised plans to be submitted by the end of the year for start soon after
The proposed development from the owners of Shawlands Arcade in the Southside will feature a mixture of ground floor shops with 330 new homes above. Subject to planning work will start on phase one next summer, allowing retailers to relocate before work on a second phase of a further 300 homes starts in 2026. Neal Jamieson, Director of Ediston Real Estate said: “We are pleased to submit plans for a viable alternative to the existing Arcade. ” “Having consulted with the community over t...
The proposed development from the owners of Shawlands Arcade in the Southside will feature a mixture of ground floor shops with 330 new homes above. Subject to planning work will start on phase one next summer, allowing retailers to relocate before work on a second phase of a further 300 homes starts in 2026. Neal Jamieson, Director of Ediston Real Estate said: “We are pleased to submit plans for a viable alternative to the existing Arcade. ” “Having consulted with the community over t...
Developer Stoneygate Living plans to build two extended blocks with one rising up to 16 storeys on land at the corner of Manchester Road, Queen Street and Grimshaw Street, Preston.
Developer Stoneygate Living plans to build two extended blocks with one rising up to 16 storeys on land at the corner of Manchester Road, Queen Street and Grimshaw Street, Preston.
Work removing 2m tonnes of rock could start within two years
Work removing 2m tonnes of rock could start within two years